This Project Involved
- Bulk Excavation
- RC Frame
- Power float Slabs
- Basements
- 3 story structure
- Waterproof concrete
- Secondary waterproof system
- Drainage services
- External works
Obsidian Groundworks was the principal contractor for this stunning 3-story private property in Brighton with a basement. The job featured a bulk excavation as well as a range of waterproofing systems.
Value: £3.5 Million